Energy saving type:
() Assessment of energy saving technical measures
[]
<>
① Summarize the production process, power, construction, water supply and drainage, HVAC and air conditioning according to the project energy use plan , lighting, control, electrical and other aspects of specific measures include: new energy-saving technologies, new processes, new equipment applications; energy recovery and utilization such as waste heat, residual pressure, combustible gas recovery and utilization; comprehensive utilization of resources, new energy and renewable energy utilization, etc. . <>
②Analyze the feasibility and rationality of energy-saving technical measures. If production intensity has a greater impact on energy-saving measures, the feasibility and rationality can be assessed separately for different production intensities.
<>
() Evaluation of energy-saving management measures
<>
① In accordance with the "Energy Management System Requirements" (B/) and "Industrial Enterprise Energy Management Guidelines" (B/ ) and other standards require that the energy-saving management system and measures of the evaluation project include the establishment of energy-saving management institutions and personnel;<>
② Prepared in accordance with the requirements of standards such as "General Rules for the Equipment and Management of Energy Measuring Instruments in Energy-Consuming Units" (B) The energy measurement system construction status of evaluation projects such as a list of energy measurement instruments and an energy measurement network diagram includes energy statistics and monitoring, the provision of measurement instruments, and the deployment of professional personnel.
<>
() Single energy-saving project evaluation
<>
①Analyze and evaluate the process flow, equipment selection, single energy-saving calculation method, and unit energy-saving investment of a single energy-saving project , investment estimation and investment payback period, etc. <>
②Analyze the technical indicators and feasibility of individual energy-saving projects. <>
Note: Any energy-saving projects that cannot be included in the dominant process flow of the construction project (such as combined heat and power) and are planned to be constructed in phases (such as blast furnace top pressure differential power generation) should be listed separately as energy-saving projects in the feasibility study report.
<>
()Effect evaluation of energy-saving measures
<>
①Analyze and calculate the energy savings of major energy-saving measures;<>
②Evaluate the effect of project energy-saving measures. International and domestic comparative analysis of indicators such as energy consumption per unit product (transportation volume, building area), energy consumption per main process, and energy consumption per unit investment illustrates whether the design indicators have reached the domestic advanced level or the international advanced level in the same industry through the adoption of energy-saving measures.
<>
() Economic evaluation of energy-saving measures
<>
Calculate the cost and economic benefits of energy-saving technology and management measures and evaluate the economic feasibility of energy-saving technology measures and management measures.
Shenzhen Energy Saving and Emission Reduction Effect Assessment Report Shenzhen Civil Engineering Budget Shenzhen Consulting Company